Latest Project Updates
Rs.18500 Million New Lithium-Ion Battery Mfg. Unit in Jajpur, Odisha
Executive Summary: A ₹18,500 million Lithium-Ion Battery Manufacturing Unit in Jajpur, Odisha, will produce synthetic graphite anode for electric vehicle batteries and energy storage systems. Investment approval was secured in December 2024, advancing the project.
New UPVC Pipes and Fitting Unit in Patna, Bihar
Executive Summary: A new facility in Patna, Bihar, will produce UPVC Pipes (10 MT/Day), HDPE Pipes (15 MT/Day), and PVC Water Tanks (4 MT/Day) to meet growing demand. State pollution control consent secured, paving the way for this significant manufacturing project.
Rs.20050 Million Photovoltaic Solar Cells and Modules Mfg. Facility in Khurdha, Odisha
Executive Summary: A Rs. 20,050-million photovoltaic solar cell and module manufacturing facility is planned in Khurdha, Odisha. The project aims to meet growing solar energy demand and has received investment approval from Odisha's High-Level Clearance Authority as of December 2024.
Rs.14300 Million New Manufacturing Unit in Andhra Pradesh
Executive Summary: A Rs. 14,300-million aerospace parts and assemblies manufacturing unit is planned in Andhra Pradesh to strengthen capabilities in the aerospace and defense sectors. The project has received investment approval from the State Investment Promotion Board as of December 2024.
Rs.461 Million Lithium Iron Battery Mfg. Project in Kathua, Jammu and Kashmir
Executive Summary: A new manufacturing facility for Lithium Iron Batteries is planned in Kathua, Jammu and Kashmir, with an annual production capacity of 22,200 units. The project, estimated at ₹461.2 million, aims to meet the growing demand for energy storage solutions. As of November 2024, the project has received consent from the state pollution control authorities.
Rs.328 Million Lithium Ion Cell Battery Mfg. Project in Kathua, Jammu and Kashmir
Executive Summary: A new facility for manufacturing Lithium Ion Cell Batteries is planned in Kathua, Jammu and Kashmir, with an annual production capacity of 21,600 units. The project, estimated at ₹328.8 million, aims to support the growing demand for energy storage solutions. As of November 2024, the company has received consent from the state pollution control authorities to proceed.
Rs.537 Million New Plastic Product and Tape Mfg. Project in Samba, Jammu and Kashmir
Executive Summary: A new manufacturing facility is set to be established in Bari Brahmana, Jammu and Kashmir, focusing on producing Self Adhesive BOPP Tape and a variety of plastic products, including bottles, caps, and measuring cups. With an annual production capacity of 518.4 million meters of tape and 2612 MT of other items, the project is estimated to cost ₹537.6 million.
Rs.150 Million New Drone Mfg. Facility in Bihar
Executive Summary: A new 16,000-square-foot drone manufacturing facility is planned in Bihar Industrial Area, with an annual production capacity of 24,000 drones. The project, costing Rs. 150 million, aims to boost local industrial growth and innovation. As of November 2024, pre-project activities, including site preparation and clearances, are in progress to advance this significant technological initiative.
New Tractor Parts Mfg. Project in Mohali, Punjab
Executive Summary: A new manufacturing facility is planned in Phase 7 Industrial Area, Mohali, Punjab, to produce 800 tractor parts and 1000 shell bodies daily. The project, estimated at Rs. 90 million, aims to meet the growing demand in the agricultural and automotive sectors. As of November 2024, necessary consent from state pollution control authorities has been obtained to proceed with construction.
Rs.406103 Million New Semiconductor Wafer Fabrication Project in Ahmadabad, Gujarat
Executive Summary: A new semiconductor wafer fabrication facility is planned in Dholera, Ahmedabad, Gujarat, with a built-up area of 1,47,006.53 sq. m. and an estimated cost of Rs. 406,103.7 million. Construction will begin in April 2024 and finish by April 2028. The project, designed to advance India's semiconductor capabilities, is under review for environmental clearance as of November 2024.