Rs.300000 Million Rourkela Steel Plant Expansion Project in Odisha
Executive Summary: A steel plant expansion project in Odisha aims to double its capacity to 9 million tonnes per annum, enhancing domestic steel production. With an estimated investment of ₹300,000 million, the initiative will support infrastructure and manufacturing growth. As of March 2025, pre-project activities are underway, marking progress toward full-scale implementation.
M.S. Pipe Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new M.S. Pipe manufacturing project is planned in Industrial Area Siltara, Phase-II, Raipur, Chhattisgarh. It includes the production of M.S. Pipes (60,000 M.T./Year), Tube or Pipe Fittings (30,000 M.T./Year), Re-Rolled Products (59,900 M.T./Year), and Scrap Packaging (40,000 M.T./Year). With an estimated investment of ₹
Rs.110580 Million New Greenfield Integrated Advanced Specialty Steel Plant in Dhenkanal, Odisha
Executive Summary: A new Greenfield Integrated Advanced Specialty Steel Plant is planned in Gajamara, Dhenkanal, Odisha, with a capacity of 1.43 MTPA. The ₹110,580 million project includes an advanced steel and automotive components manufacturing complex. Construction is set to begin in October 2025 and finish by November 2032. The project is awaiting environmental clearance.
MS Billets Mfg. Expansion Project in Raipur, Chhattisgarh
Executive Summary: A new MS Billets manufacturing expansion project is planned in Tanda and Mohdi, Mohdi Road, Block-Dharsiwa, Raipur, Chhattisgarh. The project will increase MS Billets capacity from 33,600 MTPA to 58,806 MTPA by upgrading the induction furnace and adding a rolling mill with a 57,922 MTPA capacity. As of March 2025, the project has received state pollution control approval.
New Mild Steel Wire, Weld Mesh Mfg. Project in Siddipet, Telangana
Executive Summary: A new Mild Steel Wire and Weld Mesh manufacturing unit is planned at Industrial Park, Tuniki Bollaram, Mulugu Mandal, Siddipet, Telangana, with an installed capacity of 1,000 TPM. The project, costing ₹31.5 million, aims to boost industrial production. As of March 2025, it has received environmental clearance from state pollution control authorities.
New Aluminium Profiles Mfg. Project in Sangareddy, Telangana
Executive Summary: An aluminium profiles manufacturing project is set to launch in Sangareddy, Telangana, with a capacity of 20 TPD and an investment of ₹39.9 million. As of March 2025, it has received environmental clearance from state pollution control authorities, marking a key step toward its development.
Rs.4980 Million Steel Plant Expansion Project in Sundargarh, Odisha
Executive Summary: A Steel Plant Expansion Project in Sundargarh, Odisha, includes installing DRI plants, a coal washery, induction and ladle furnaces, and a steel rolling mill. The project will use local iron ore, dolomite, and coal. With environmental clearance and state pollution control consent, the project also includes installing DG sets with an investment of Rs. 52.7 million as of July 2024.
Sponge Iron Mfg. Project in Bemetara, Chhattisgarh
Executive Summary: A steel manufacturing company plans to develop a Sponge Iron Manufacturing Project in Bemetara, Chhattisgarh. The project includes DRI kilns, an induction furnace, rerolled steel production, a 25 MW captive power plant, a ferro alloy unit, fly ash brick production, and a coal gasifier. As of March 2025, it has received environmental clearance to proceed.
Rs.362 Million Steel Mfg. Expansion Project in Siddipet, Telangana
Executive Summary: A significant expansion project is planned in Pamalparti and Pregnapur, Telangana, aimed at increasing manufacturing capacities for MS Billets from 56,000 tons per annum to 213,000 tons, and TMT Bars from 31,100 tons to 202,250 tons. With an estimated cost of Rs. 250 million, construction is set to begin in July 2025 and conclude by December 2025, pending environmental clearance.
New Copper Powder Mfg. Unit in Sangareddy, Telangana
Executive Summary: A new manufacturing unit is planned in Sangareddy, Telangana, for producing copper powder (20 TPM), bronze powder (20 TPM), tungsten heavy alloy (20 TPM), and ferrous powder (1 TPM). With an investment of Rs. 74.8 million, the project has received environmental clearance as of March 2025, paving the way for construction and operational setup.