Latest Project Updates
Fabricated Metal Products Mfg. Expansion Project in Raipur, Chhattisgarh
Executive Summary: A major manufacturing facility in Raikheda, Raipur, Chhattisgarh is expanding its industrial output across a 7.284-hectare site. The project boosts fabricated metal capacities to 60,000 MT/Year, prefab structures to 60,000 MT/Year, and fly ash building blocks to 5,00,00,000 units annually, while introducing a 3,00,000 MT/Year biomass briquette plant. Statutory state pollution control consent was secured as of June 2026.
Rs.1223 Million Melting of Non-Toxic Metals Expansion Project in Ahmadabad, Gujarat
Executive Summary: A non-toxic metal melting expansion project is planned for Dekavada, Detroj-Rampura, Ahmedabad, Gujarat, utilizing gas or electrical fuel infrastructure. The development scales annual production capacity to between 60,000 and 1,20,000 tonnes. Backed by a capital investment of Rs. 1,223.3 million, construction will run from July 2026 to June 2027, pending mandatory state environmental clearance.
Rs.180000 Million Integrated Steel Plant Expansion Project in Ballari, Karnataka
Executive Summary: An integrated steel plant in Ballari, Karnataka, is executing a massive Rs. 180,000 million brownfield expansion. The project will augment existing facilities to boost annual crude steel production from 5 MTPA to 14 MTPA. Currently awaiting state environmental clearance as of June 2026, on-site construction is scheduled to span from April 2027 through April 2030.
Rs.3100 Million New Greenfield Steel Plant in Giridih, Jharkhand
Executive Summary: A new Rs. 3,100 million greenfield heavy metallurgical facility is planned for development in Giridih, Jharkhand. The plant will feature manufacturing capacities of 1,50,000 TPA pig iron, 1,05,000 TPA sponge iron, and 1,95,000 TPA sinter, powered by an integrated 22 MW captive plant. Environmental clearance processing began in June 2026, with construction scheduled for January to October 2027.
Rs.220560 Million Aluminium Smelter Expansion Project in Singrauli, Madhya Pradesh
Executive Summary: A major metallurgical expansion project is planned across several villages in Bargawan, Singrauli, Madhya Pradesh. The massive Rs. 2,20,560 million development will expand an aluminium smelter from 3.98 LTPA to 7.96 LTPA and boost captive power generation from 900 MW to 1,500 MW. Environmental clearance was sought in May 2026, with construction slate to run from April 2027 through December 2029.
Rs.209 Million New Ferrous and Non- Ferrous Metal Extraction Unit in Gurugram, Haryana
Executive Summary: A new Rs. 209.4 million Ferrous and Non-Ferrous Metal Extraction Unit is planned over 40,493.69 m² in Village Mao, Pataudi, Gurugram, Haryana. The metallurgical facility filed for SEIAA environmental clearance in June 2026. Fast-track plant construction is scheduled to break ground in July 2026, with full operational commissioning targeted for July 2027.
New Aluminium Ingots Mfg. Project in Khordha, Odisha
Executive Summary: A new aluminum smelting facility is coming up at the Sarua Industrial Estate in Khordha, Odisha. The project involves setting up an Aluminium Ingots manufacturing unit with a capacity of 24,000 MT/A. As of June 2026, the metal recovery plant has secured its formal Consent to Establish from state pollution control authorities to begin immediate structural installation.
Rolling Mill Expansion Project in Surajpur, Chhattisgarh
Executive Summary: A steel production unit in Surajpur, Chhattisgarh, is expanding its rolling mill capacity from 59,400 TPA to 119,900 TPA. The brownfield development carries an estimated cost of Rs. 50 million. With a swift construction phase planned for October 2026, the expansion proposal is currently undergoing regulatory environmental clearance under the state-level authority.
New MS Loose Items Mfg. Project in Anakapalli, Andhra Pradesh
Executive Summary: An engineering enterprise is setting up a new Rs. 35 million steel fabrication plant in Anakapalli, Andhra Pradesh. The unit will manufacture specialized mild steel (145 TPM total) and stainless steel (80 TPM total) components, sub-assemblies, and main assemblies. State pollution control authorities have officially granted Consent to Establish, clearing the project for immediate site development.
Rs.700000 Million New Integrated Surface Coal Gasification Facility in Nagpur, Maharashtra
Executive Summary: A major multinational conglomerate is setting up a massive Rs.700,000 million integrated surface coal gasification and downstream chemical derivatives facility near Nagpur, Maharashtra. The complex will produce syngas, ammonia, and hydrogen. Backed by formal state government investment approvals as of May 2026, this multi-phased clean-energy project is projected to create 30,000 regional jobs.