Latest Project Updates
Printing Inks Mfg. Expansion Project in Mahaboobnagar, Telangana
Executive Summary: A printing inks manufacturing expansion project is planned in Burgul, Farooqnagar, Mahaboobnagar, Telangana, increasing capacity from 6.57 TPD to 7.39 TPD. The project is estimated to cost Rs.62.775 million. As of August 2025, it has received consent from the state pollution control authorities, ensuring compliance with environmental regulations before establishment.
Rs.900 Million New Commercial Hotel Construction Project in Rangareddy, Telangana
Executive Summary: A new commercial hotel with 181 rooms and a restaurant block is planned in Mamidipally, Rangareddy, Telangana. The hotel will feature a single block of B+G+8 floors and a restaurant block of G+2 floors, with a parking area of 5,385 sq.m. The project, estimated at Rs. 900 million, has received state pollution control approval as of August 2025.
Rs.61157 Million New Data Center Construction Project in Ranga Reddy District, Telangana
Executive Summary: A new data center construction project is planned in Fab City and E-City, Telangana, involving Phase 3, Building-3, and ancillary facilities such as MMR, MV, HSD PANEL, and HSD PUMP rooms. Estimated at Rs. 61,157.2 million, construction began in November 2020 and is expected to finish by June 2030. The project is under environmental clearance review
Rs.152 Million New Research and Development Facility in Medchal-Malkajgiri, Telangana
Executive Summary: A new R&D facility for APIs, API intermediates, and specialty fine chemicals is planned in IDA, Gandhinagar, Kukatpally, Medchal-Malkajgiri, Telangana, with an estimated cost of Rs. 152.5 million. As of August 2025, the project has obtained consent from the state pollution control authorities for establishment.
Rs.2500 Million Pharmaceutical Formulation Unit Expansion Project in Medchal-Malkajgiri, Telangana
Executive Summary: A pharmaceutical formulation unit in Koltur, Shameerpet, Medchal-Malkajgiri, Telangana, is set for expansion, increasing capacities for tablets, capsules, and injections. Estimated at ₹2,500 million, the project aims to boost production and efficiency. As of August 2025, it has received consent from state pollution control authorities to proceed with establishment.
Rs.152 Million New Plywood and Block Boards Mfg. Project in Mahabubnagar, Telangnana
Executive Summary: A new plywood and block board manufacturing project is planned in Mothighanpur Village, Balanagar Mandal, Mahabubnagar, Telangana. The unit will produce UF, PF, and MF boards ranging from 4mm to 25mm, with a capacity of 7,500 units per day. The project, estimated at Rs. 152.4 million, received establishment consent from state pollution control authorities in August 2025.
New Disposable IV sets Mfg. Project in Rangareddy, Telangana
Executive Summary: A new disposable IV sets manufacturing project is planned in Plastic Park, Thummaloor Village, Mankhal, Maheshwaram, Rangareddy, Telangana, with a production capacity of 1,000,000 units per month. The project is estimated to cost Rs. 62.4 million. As of August 2025, it has received consent from the state pollution control authorities for establishment.
Sheet Metal Mfg.Expansion Project in Sangareddy, Telangana
Executive Summary: A sheet metal manufacturing expansion project is planned at Mahindra Vendor Park, Buchinelly, Zaheerabad, Sangareddy, Telangana. The project aims to increase production capacity from 18,000 TPA to 20,000 TPA, with an estimated cost of Rs. 76.1 million. As of August 2025, the company has received approval from state pollution control authorities to establish the project.
Rs.107 Million Aluminium Blister Foils Mfg. Project in Sangareddy, Telanagana
Executive Summary: A new manufacturing project is planned in IDA Bollaram, Jinnaram, Sangareddy, Telangana, to produce aluminium blister foils (15 TPD), aluminium strip foils (10 TPD), laminated foils (20 TPD), and PET bottles (12 TPD). With an estimated cost of Rs. 107 million, the project has received establishment consent from the state pollution control authorities as of August 2025.
Filling cum Storage of Compressed Natural Gas Unit in Khammam, Telangana
Executive Summary: A new project for the filling and storage of compressed natural gas, with a capacity of 25,000 kg/day, is planned in Venkatagiri, Gudimalla, Khammam Rural, Telangana. With an estimated cost of Rs. 29.9 million, the project has received establishment consent from the state pollution control authorities as of August 2025, paving the way for implementation.