Latest Project Updates
New Maxillofacial Implants Mfg. Project in Sangareddy, Telangana
Executive Summary: A new project is planned in Medical Device Park, Sultanpur, Ameenpur, Sangareddy, Telangana, for manufacturing 80 maxillofacial implants and 100 dental prosthetics daily. With an estimated investment of ₹49.9 million, the project has received consent from the state pollution control authorities as of August 2025 and is poised to support the growing demand for medical implant solutions.
Soya Crude Oil Mfg. Expansion Project in Sangareddy, Telangana
Executive Summary: A soya crude oil manufacturing expansion project is planned in Industrial Park Phase-II, Buchinell, Zaheerabad, Sangareddy, Telangana. The project will increase production capacity from 54 TPD to 81 TPD for soya crude oil and from 240 TPD to 363 TPD for Hypro de-oiled cake. With an estimated cost of ₹45.2 million, it has received pollution control board approval.
Rs.595 Million Metal Injection Moulding Parts Mfg Unit in Rangareddy, Telangana
Executive Summary: A new metal injection moulding parts manufacturing unit is planned in IP General Park, Maheshwaram, Rangareddy, Telangana. With a proposed capacity of 40 tons per month, the project is estimated to cost ₹595.7 million. As of August 2025, necessary environmental clearances have been granted by state pollution control authorities, allowing the project to proceed toward establishment.
Rs.1800 Million Commercial Hotel Construction Project in Ranga Reddy, Telangana
Executive Summary: A commercial hotel project is planned in Puppalguda Village, Gandipet Mandal, Ranga Reddy, Telangana, covering a site area of 4,856.2 sq.m and a built-up area of 39,650 sq.m with 3 basements, a ground floor, and 25 upper floors. Estimated at Rs. 1,800 million, construction is set to begin in October 2025 and conclude by October 2028.
Rs.2750 Million New Hotel Construction Project in Rangareddy, Telangana
Executive Summary: A new commercial hotel project is planned in Puppalguda, Gandipet, Rangareddy, Telangana, featuring 4 basements, a stilt floor, and 22 upper floors. The development covers a plot area of 5,919.2 sq. meters with a built-up area of 52,255.8 sq. meters and an estimated cost of Rs. 2,750 million. As of July 2025, environmental consent has been granted.
New Dairy Unit in Mahbubnagar, Telangana
Executive Summary: A new dairy unit is planned in Mudireddypally, Rajapur, Mahbubnagar, Telangana, with a production capacity for milk, ghee, curd, butter, paneer, bread, and batter. The project includes an estimated investment of Rs. 71.8 million. As of July 2025, it has received consent from the state pollution control authorities to establish the facility and begin operations
Rs.281 Million Pharmaceutical Formulations Unit Expansion Project in Medchal-Malkajgiri, Telangana
Executive Summary: A pharmaceutical formulations unit in Phase-I, IDA Jeedimetla, Medchal-Malkajgiri, Telangana, is set for expansion, increasing monthly production of tablets, capsules, and injection vials significantly. The project, estimated at Rs. 281 million, has received environmental clearance from the state pollution control authorities as of July 2025.
Rs.290 Million Vaccines Mfg. Expansion Project in Siddipet, Telangana
Executive Summary: A pharmaceutical expansion project in Karkapatla Village, Telangana, will produce 100 million vaccine doses and 25 million animal health formulations annually. With an estimated investment of Rs. 290 million, the company aims to boost capacity for human and veterinary healthcare. Environmental clearance was granted by the state pollution control authorities in May 2024.
Rs.420 Million New Filters and Accumulators Mfg. Project in Sangareddy, Telangana
Executive Summary: A new filters and accumulators manufacturing project is planned in Vavilala Village, Jinnaram Mandal, Sangareddy, Telangana, with a capacity of 1 lakh units annually. The project is estimated to cost Rs. 420.9 million. As of July 2025, necessary environmental clearance has been obtained from the state pollution control authorities for establishing the facility.
Rs.163262 Million Telangana Super Thermal Power Project, Phase-II in Telangana
Executive Summary: A major thermal power project is underway in Telangana, featuring three 800 MW units to enhance regional power capacity. Initially estimated at ₹293,448 million, the revised cost is ₹163,262 million. Construction is set to begin in September 2025 and finish by August 2030. As of July 2025, the project is awaiting environmental clearance from the state authority.