Latest Project Updates
Rs.524 Million Bulk Drug and Intermediates Mfg. Expansion Project in Sangareddy, Telangana
Executive Summary: A pharmaceutical company plans to expand its bulk drug and intermediates manufacturing facility in Sangareddy, Telangana, increasing capacity to 4,600 kg/day. The project is estimated at Rs. 524.4 million. As of May 2025, the company has obtained consent from the state pollution control authorities to proceed with the establishment of the expanded unit.
Rs.1818 Million Steel Plant Expansion Project in Medak, Telangana
Executive Summary: A Company is planning to take up steel plant expansion project in Medak, Telangana. The project involves expansion of steel plant to manufacture M.S. Billets from 600 TPD to 1320 TPD & Rolling Mill for manufacturing of TMT Bars and Structural Steel from 600 TPD to 1300 TPD.
Rs.1998 Million Bulk Drugs Mfg. Expansion Project in Sangareddy, Telangana
Executive Summary: A bulk drug manufacturing expansion project is planned in Phase 2, IDA Pashamailram, Patancheru, Sangareddy, Telangana, aiming to increase production capacity to 4,243.33 kg/day. With an estimated investment of Rs. 1,998.396 million, the project has received consent for establishment from the state pollution control authorities as of May 2025.
New Aluminum Ingots Mfg. Project in Nalgonda, Telangana
Executive Summary: A new project is planned in Kattangur, Nalgonda, Telangana, to manufacture 40 TPD of aluminum ingots and convert 54 TPD of lead battery scrap into lead alloys. With an estimated investment of Rs. 32 million, the initiative has received consent from the state pollution control authorities as of May 2025, marking a key step toward project establishment.
Engineering Unit Expansion Project in Sangareddy, Telangana
Executive Summary: An engineering unit expansion is planned in Pashamylaram, Patancheru, Sangareddy, Telangana, involving the addition of products like Nozzle Diaphragm Sets (46.8 TPA) and Diaphragm Fabrication & Assembly (200 units annually). Estimated at Rs. 40 million, the project has received consent from the state pollution control authorities for establishment as of May 2025.
New Metal Sheet Fabricated Items Mfg. Project in Vikarabad, Telangana
Executive Summary: A new project is planned in IP Rakamcherla, Pudur, Vikarabad, Telangana, for manufacturing 5,000 metal sheet fabricated items annually. With an estimated investment of Rs. 39.996 million, the initiative aims to boost local industrial output. As of May 2025, the project has secured establishment consent from the state pollution control authorities.
Rs.390 Million Sugar Boiled Confectionary Mfg. Expansion Project in Medchal-Malkajgiri, Telangana
Executive Summary: A confectionery manufacturer plans to expand its facility in Gundlapochampally, Medchal-Malkajgiri, Telangana, increasing capacities for sugar boiled confectionery, chocolates, instant noodles, and sandwich enrobed biscuits. The Rs. 390 million project has received consent for establishment from the state pollution control authorities as of May 2025, enabling the company to move forward with its production scale-up.
Rs.125 Million Foams Products Mfg. Expansion Project in Medak, Telangana
Executive Summary: A foam products manufacturer is set to expand operations in Shankarampet, Medak, Telangana, with plans to produce 2,667 sofas and 30,000 pillows monthly. The project, valued at Rs. 125 million, has received environmental clearance from the state pollution control authorities as of May 2025, marking a key step toward establishment.
Rs.5000 Million New BOPET Mfg. Project in Rangareddy, Telangana
Executive Summary: A company is planning to establish a BOPET manufacturing project in Rangareddy, Telangana with a capacity of 4000 TPM at a cost of Rs. 5000 million. The company has received consent from the state pollution control authorities as of February 2022.
Rs.1233 Million New Compressed Bio Gas Project in Hanumakonda, Telangana
Executive Summary: A new Compressed Bio Gas project is planned in Suraram, Elakathurthy, Hanumakonda, Telangana, with a capacity of 20.85 TPD. Estimated at Rs. 1233.6 million, the project aims to support sustainable energy initiatives. As of May 2025, it has received consent from state pollution control authorities for establishment.