New MS Billet/ MS Ingots Mfg. Unit in Medak, Telangana
Executive Summary: A new MS Billets and MS Ingots manufacturing unit is planned in Kamaram, Shankarampet, Medak, Telangana, with a production capacity of 57,000 tons per annum (TPA). The project, costing Rs. 72.4 million, has received approval from the state pollution control authorities as of October 2024, allowing the company to move forward with construction and development.
Rs.2503 Million Auto Components Mfg. Expansion Project in Telangana
Executive Summary: An auto components manufacturing expansion project is planned in Gagillapur, Telangana, aimed at significantly increasing production capacity. This includes 316,000 molded case circuit breakers, 400,000 auxiliary contact blocks, and 48,602 circuit breakers rated up to 1,000 volts annually. Estimated at Rs. 2,503.772 million, the project has received consent from state pollution control authorities as of October 2024.
New Poultry Feed Mfg. Project in Mahbubnagar, Telangana
Executive Summary: A new poultry feed manufacturing project is planned in Gudibanda, Mahbubnagar, Telangana, with a production capacity of 8.4 tons per day and provisions for raising 2,800 boiler birds daily. Estimated at Rs. 33.7 million, the project aims to support local farmers by providing high-quality feed. As of October 2024, it has received consent from state pollution control authorities to proceed.
Rs.43 Million New Frame Mfg. Project in Medak, Telangana
Executive Summary: A specialized alloy manufacturer is setting up a new facility in Shabashpalle Village, Medak, Telangana, to produce 100,000 alloy frames annually. The Rs. 43.5 million project aims to meet rising demand in automotive and industrial sectors. Pre-project activities, including land development and procurement planning, are underway, with plans to integrate advanced manufacturing technologies for improved efficiency and product quality.
Food Mfg. Expansion Project in Siddipet, Telangana
Executive Summary: A new health and wellness product manufacturing facility is being developed in Rajagopalpet Village, Telangana, with an investment of Rs. 29.4 million. The plant will produce Spirulina, Ganoderma, Noni Juice, beverages, dry foods, and nutraceuticals. As of October 2024, the project is in its pre-construction phase, aiming to expand production capacity and meet growing demand in the region.
Rs.1650 Million New Engineering Components Mfg. Unit in Medchal, Telangana
Executive Summary: A new engineering components manufacturing unit is being developed in Industrial Park Tunikibollaram, Siddipet, Telangana, with an investment of Rs. 1,650 million. The project includes producing steam and gas turbine blades at a capacity of 6,000 units per day. By October 2024, the company had invested an additional Rs. 47 million and received environmental approvals.
Rs.600 Million Bulk Drugs & Drug Intermediates Mfg. Unit Expansion Project in Telangana
Executive Summary: A pharmaceutical company is planning to expand its bulk drugs and drug intermediates manufacturing unit in Telangana. The expansion will increase production capacity from 25 TPM to 199 TPM within the existing 5.381-acre facility. Estimated at ₹600 million, construction is set to begin in March 2025 and conclude by December 2027. Environmental clearance is pending.
Rs.4971 Million Missiles Assembling Unit in Rangareddy, Telangana
Executive Summary: A new missiles assembling unit is planned in Mamidipally, Maheshwaram, Rangareddy, Telangana, with a capacity of 1,000 units annually and an estimated cost of Rs. 4,971 million. The project has received consent from the state pollution control authorities as of October 2024, moving forward toward construction.
Rs.5000 Million New Hospital Project in Rangareddy, Telangana
Executive Summary: A new hospital project is planned in Gachibowli, Serilingampally, Rangareddy, Telangana, featuring a 920-bed facility. The project, estimated to cost Rs. 5,000 million, aims to provide advanced healthcare services with modern infrastructure. As of October 2024, the project has received consent from the state pollution control authorities, clearing the way for construction to begin.
New Metal Mfg. Project in Ranga Reddy, Telangana
Executive Summary: A steel manufacturer plans to expand its production capacity, increasing output from 124.5 tons per day (TPD) to 180 TPD. The project, estimated at Rs. 30 million, aims to meet rising demand in the construction and industrial sectors. Construction is set to begin in May 2025, pending environmental clearance from the SEIAA.