Latest Project Updates
New Electrical Panel Mfg Unit In Sangareddy, Telengana.
Executive Summary: A new Electrical Panel Manufacturing Unit is planned in Sangareddy, Telangana, aiming to produce 5 electric panels and 15 LT panels monthly with a Rs. 45 million investment. As of July 2024, the project has received environmental consent, highlighting efforts to expand manufacturing capabilities while adhering to regulations, fostering local industrial growth and infrastructure development.
New Pharma Formulation Unit in Siddipet, Telangana
Executive Summary: A new Pharma Formulation Unit is planned in Karkapatla, Markook, Siddipet, Telangana, with capabilities to produce 400,000 tablets and 50,000 capsules daily, costing Rs. 58.3 million. As of July 2024, the project has received consent from state pollution control authorities to proceed with establishment, aiming to enhance pharmaceutical production capacity and contribute to local economic growth.
Rs.204 Million New Bakery and Confectionary Unit in Rangareddy, Telangana
Executive Summary: A new Bakery and Confectionary Unit is planned in Thimmapur, Kothur, Rangareddy, Telangana, with a capacity of 8,000 kg per day and an estimated cost of Rs. 204.2 million. As of July 2024, the project has received consent from state pollution control authorities to proceed with its establishment.
GI Wire Mfg. Expansion Project in Medak, Telangana
Executive Summary: A manufacturing expansion project in Shankarampet, Medak, Telangana, will increase GI Wire production from 1,200 TPA to 4,800 TPA and collonated nails from 3,000 TPA to 7,000 TPA. With an estimated cost of Rs. 85 million, the project has received state pollution control authority consent as of July 2024, aiming to meet demand and boost regional economic growth.
Rs.167 Million New Formulation Unit in Siddipet, Telangana
Executive Summary: A new formulation unit in Karkapatla, Markook, Siddipet, Telangana, will produce Carbomer, Copovidone, Crosspovidone, and Extra White Maize Starch, among other pharmaceutical ingredients. Estimated at Rs. 167 million, the project has received state pollution control authority consent as of July 2024, aiming to boost production capacity and meet growing demand in the pharmaceutical sector.
Rs.122 Million New Capsules Mfg. Unit in Siddipet, Telangana
Executive Summary: A new capsules and pellets manufacturing unit in Siddipet, Telangana, aims to produce 1 million capsules monthly and 50 tons of pellets monthly, costing Rs. 122.3 million. As of July 2024, the project has received state pollution control approval, emphasizing compliance with environmental regulations and advancing pharmaceutical manufacturing capabilities in the region.
New Non Explosives Emulsion Matrix Mfg. Unit in Peddapalli, Telangana
Executive Summary: A new manufacturing unit for Non-Explosives Emulsion Matrix is planned in Julapalle, Kamanpur, Peddapalli, Telangana, producing 8500 TPM at a cost of Rs.55.206 million. As of July 2024, the project has secured consent from state pollution control authorities, enabling its establishment in compliance with environmental regulations.
Rs.664 Million Liquid Detergent Mfg. Expansion Project in Rangareddy, Telangana
Executive Summary: A liquid detergent manufacturing expansion project is planned in Penjerla, Kothur, Rangareddy, Telangana, doubling capacity from 320 TPD to 690 TPD at a cost of Rs.664.8 million. As of July 2024, the project has secured consent from state pollution control authorities, facilitating its establishment in compliance with environmental regulations.
Rs.2500 Million New Chemical Mfg. Unit in Sangareddy, Telangana
Executive Summary: A new chemical manufacturing unit is being planned in Indrakaran, Kandi, Sangareddy, Telangana, with production capacities for chemicals like Linaclotide, Desmopressin Acetate, Calcitonin Salmon, Teriparatide Acetate, and Tirzepatide. The project, estimated to cost Rs. 2500 million, has received state pollution control consent as of July 2024.
New Bulk Drugs Mfg. Project in Sangareddy, Telangana
Executive Summary: A new bulk drugs manufacturing project in Pashamylaram, Telangana, plans to produce chemical products and Active Pharmaceutical Ingredients (APIs). Capacities include group A (559.16 Kgs/day), group B (500.32 Kgs/day), and solvent distillation (75000 Kgs/month). With an investment of Rs.486.973 million, the project received state pollution control authorities' consent in December 2023, progressing towards establishment as of July 2024.