Latest Project Updates
Rs.250 Million New Bottling Plant in Muzaffarnagar, Uttar Pradesh
Executive Summary: A new bottling plant is slated for construction in Muzaffarnagar, Uttar Pradesh, by a prominent company in the liquor industry. With an estimated cost of Rs. 250 million, the project focuses on producing Indian Made Foreign Liquor. Approval from the board of directors in February 2024 signals the company's commitment to enhancing production capabilities in the dynamic liquor sector.
Rs.73809 Million New Chichlik Pumped Storage Hydro Project in Sonbhadra, Uttar Pradesh
Executive Summary: An upcoming hydro project in Robertsganj, Uttar Pradesh, plans to develop a 1560 MW Chichlik Pumped Storage Hydro Project, featuring newly constructed Upper and Lower reservoirs. The estimated cost is Rs.73809 million, with construction set to begin in January 2025 and conclude by December 2027. The project, submitted for environmental clearance in January 2024, aims to utilize water from the Sone River for a one-time filling.
Rs.2000 Million New Dia Steel Gas Pipeline in Uttar Pradesh
Executive Summary: In Uttar Pradesh's Muzaffarnagar, Shamli, and Bijnor Districts, a significant infrastructure project is underway for a new dia steel gas pipeline. Covering approximately 89.00 kilometers from Thana Bhawan to Bijnor Town, the 18"/16" Dia Steel Gas Pipeline is estimated to cost Rs.2000 million. Construction activities began in November 2023 and are expected to conclude by April 2024. As of January 2024, the project is awaiting environmental clearance, demonstrating a commitment to regulatory compliance and sustainable development in gas infrastructure.
New Cattle Feed Mfg. Project in Jagdishpur, Uttar Pradesh
Executive Summary: A cattle feed manufacturing project is underway in Amethi, Uttar Pradesh, led by a prominent company. With a monthly capacity of 4000 metric tons, the initiative emphasizes modern, sustainable manufacturing practices. In January 2024, regulatory approval was obtained, highlighting the company's commitment to environmental compliance. The strategic location in the Industrial Area of Jagdishpur positions the project to meet local demands and contribute to regional agricultural development.
New PET Preform Mfg. Project in Ayodhya, Uttar Pradesh
Executive Summary: A new PET Preform Manufacturing Project in Chandpur Harbans, Uttar Pradesh, is set to produce 2520 MT/D of PET Preform and 240 MT/D of HDPE Closure. As of January 2024, regulatory approval has been obtained from state pollution control authorities, affirming the company's commitment to environmentally compliant and technologically advanced operations in the strategically chosen location. The project aims to contribute to the local economy through job creation and skill development while meeting industry quality standards.
Rs.3500 Million Cement Mfg. Expansion Project in Aligarh, Uttar Pradesh
Executive Summary: In Aligarh, Uttar Pradesh, a major cement manufacturing project is underway, led by a company. The project involves producing PPC and OPC cements with capacities of 73,500 and 31,500 Metric Tonnes/Day, respectively. Consent for project establishment was obtained from state pollution control authorities in May 2018. As of January 2024, a substantial expansion of the existing Clinker Grinding Unit's capacity to 4.5 Million TPA, requiring a Rs.3,500 million investment, is under consideration for environmental clearance.
Rs.3584 Million New Resort & Hotel project in Agra, Uttar Pradesh
Executive Summary: A resort and hotel project in Agra, Uttar Pradesh, located in Myapur, Fatehabad Road. The proposed development spans 63768.79 sqm, with an estimated cost of Rs.3584.8 million. Construction is scheduled to begin in March 2024 and conclude by September 2024. As of January 2024, the project is awaiting environmental clearance, having been submitted to the State Level Environment Impact Assessment Authority.
Rs.5733 Million New Four Laning Project in Uttar Pradesh
Executive Summary: The central PSU is planning a Rs.5733.8 million four-laning project for the Aligarh-Palwal section of NH-334D in Uttar Pradesh and Haryana. Spanning approximately 22.72 km, the initiative on a hybrid annuity mode is aimed at enhancing regional connectivity. Bids have been invited as of January 2024, marking a crucial step in the project's procurement process.
New Common Hazardous Waste Treatment Storage and Disposal Facility in Uttar Pradesh
Executive Summary: In Hapur, Uttar Pradesh, a new environmentally conscious project is underway, featuring a Common Hazardous Waste Treatment Storage and Disposal Facility. Valued at Rs.50 million, it includes incineration, hazardous waste pre-processing (2600 TPA), and an E-Waste dismantling facility (1000 TPA). Construction starts in April 2024, with completion by September 2024. The project, submitted for environmental clearance in January 2024, underscores a commitment to sustainable waste management and regulatory compliance.
Rs.600 Million New UP Defence Industrial Corridor in Chitrakoot, Uttar Pradesh
Executive Summary: In Chitrakoot, Uttar Pradesh, the Uttar Pradesh Expressways Industrial Development Authority is spearheading the establishment of the UP Defence Industrial Corridor. This strategic project, valued at Rs.600 million, involves the development of a corridor covering 102.43 hectares. Commencing construction in June 2024 and concluding in May 2027, the initiative adheres to environmental standards, having been submitted for clearance to the State Level Environment Impact Assessment Authority as of January 2024.