Latest Project Updates
Rs.101 Million Steel Mfg. Expansion Project in Paschim Bardhaman, West Bengal
Executive Summary: A prominent steel manufacturer is expanding its Durgapur facility with a ₹101.245 million investment. The project adds 2 x 15 MT induction furnaces to produce 100,000 MT/Year of TMT bars and wire rods. Having secured its Consent to Establish (CTE) as of March 2026, the plant will leverage advanced rolling technology to meet growing infrastructure demand in Eastern India.
Rs,1556 Million New Fairway Development Project in West Bengal
Executive Summary: A national maritime authority is executing a ₹1,556 million fairway development project in Haldia, West Bengal. Focused on creating a dedicated access channel for the local Multi-Modal Terminal, the project utilizes the EPC route to enhance river navigability. Launched in June 2023, the development is entering its final phase, with completion scheduled for June 2026.
Rs.7300 Million New Greenfield Steel Plant in Medinipur West, West Bengal
Executive Summary: A metallurgical firm is investing ₹7,300 million to build a greenfield steel plant in Paschim Medinipur, West Bengal. The facility includes a 720,000 TPA ductile iron pipe plant and mini blast furnaces. Currently seeking environmental clearance as of February 2026, construction is scheduled from March 2026 to March 2029, aiming to bolster regional industrial infrastructure and production.
Rs.1900 Million New Greenfield Steel Plant in Purba Bardhaman, West Bengal
Executive Summary: A ₹1,900 million greenfield steel plant is planned for Purba Bardhaman, West Bengal. The facility will produce sponge iron, steel billets, and 100,000 TPA of TMT/structural steel, supported by an 8 MW waste-heat recovery power plant. As of February 2026, environmental clearance is pending, with construction scheduled to run from January 2027 to December 2029.
Rs.433 Million New Industrial /Commercial/ Logistic Building in Howrah, West Bengal
Executive Summary: A developer is launching a Rs. 433.7 million integrated industrial and logistics hub in Howrah, West Bengal. Classified as a "low hazard" facility, the project targets the region's growing commercial demand. Currently seeking environmental clearance, construction is scheduled from August 2026 to August 2029, aiming to provide modern distribution infrastructure near the Kolkata metropolitan area.
New Wire Netting Mfg. Unit in Jalpaiguri, West Bengal
Executive Summary: A new wire netting manufacturing unit is planned at Shilpokutir Industrial Park, Fulbari Hat, Jalpaiguri, West Bengal. The facility will produce various wire netting and barbed wire products with capacities ranging from 125 to 500 MT per month. The project is estimated to cost Rs.49 million and has received state pollution control consent as of February 2026.
Rs.458109 Million IISCO Steel Plant Expansion Project in Paschim Bardhaman, West Bengal
Executive Summary: A major capacity expansion is planned at a steel plant in Burnpur, West Bengal, to raise production from 2.8 MTPA to up to 7.1 MTPA in phases. The project includes coke oven modernization, waste gas recovery systems, and captive power facilities. Total proposed investment exceeds ₹458,000 million, with statutory approvals secured and expansion contracts awarded as of February 2026.
New Dairy Unit in Purba Midnapore, West Bengal
Executive Summary: A new dairy processing unit is proposed at Gobindapur village under Tamluk police station in Purba Medinipur. The facility will manufacture milk packets, dahi in bulk and cups, paneer, and ghee with defined daily capacities. The project entails an investment of about Rs.91.45 million. As of February 2026, consent to establish has been obtained from state pollution control authorities.
Rs.10250 Million New Integrated Steel Plant in Bankura, West Bengal
Executive Summary: An integrated steel plant is proposed in Bankura district, West Bengal, with an investment of about ₹10,250 million. The project covers sponge iron, steel melting, ferro-alloys, briquetting, sinter, electric arc furnace, rolling mill and captive power generation. Planned capacity spans multiple units, supported by 80 MW power. Construction is slated for October 2026–April 2028, pending state environmental clearance approval process.
Rs.8100 Million New Steel Plant in Pura Bardhaman, West Bengal
Executive Summary: HMB Steel plans a greenfield integrated steel plant at Palitpur, Purba Bardhaman, West Bengal. The ₹8,100 million project will include DRI kilns, induction and arc furnaces, rolling and galvanizing units, slag processing, gas plants, and a 30 MW captive power plant. Construction is scheduled from April 2026 to March 2029, with environmental clearance under review.