Featured Manufacturing

Rs.350 Million New Electrical Control Panels Mfg. Unit in Uttar Pradesh

State: Uttar Pradesh
Investment: From 100 Million to 999 Million
Updated: 05 June 2026

Executive Summary: A new manufacturing facility for electrical control panels and electrical/electronics relays is slated for development in Uttar Pradesh. Backed by an estimated capital investment of Rs.350 million, the plant will produce advanced automation and power distribution components.

Featured Textiles

Rs.536 Million Cotton Yarn Mfg. Expansion Project in Palnadu, Andhra Pradesh

State: Andhra Pradesh
Investment: From 100 Million to 999 Million
Updated: 05 June 2026

Executive Summary: A cotton yarn manufacturing facility in Chilakaluripet Mandal, Palnadu, Andhra Pradesh, is expanding its production capacity from 4.276 TPD to 8 TPD. Backed by an estimated capital investment of Rs.536.7 million, the modernization project centers on upgrading existing spinning infrastructure. The state pollution control board officially granted the statutory "Consent to Establish" as of June 2026.

Featured Manufacturing

Rs.200 Million New Epoxy System, Polyurethane Mfg. Unit in Bangalore, Karnataka

State: Karnataka
Investment: From 100 Million to 999 Million
Updated: 05 June 2026

Executive Summary: A new specialty chemicals manufacturing plant is under development at the Adinarayana Hosahalli 2nd Phase Industrial Area in Bangalore Rural, Karnataka. Backed by a Rs. 200 million investment, the facility will produce epoxy, polyurethane, polysulfide, and silicon systems for construction applications. Following clearance from the state's SLSWCC, on-site construction and structural execution work formally commenced as of June 2026.

Featured Research and Development

Rs.180 Million New Research and Development Unit in Bangalore, Karnataka

State: Karnataka
Investment: From 100 Million to 999 Million
Updated: 05 June 2026

Executive Summary: A state-of-the-art pharmaceutical research and development facility is being constructed in the Adinarayana Hosahalli 2nd Phase Industrial Area, Bangalore Rural, Karnataka. Backed by a Rs.180 million investment, the unit will focus on drug discovery, oncology, and vaccine research. Approved by the state's SLSWCC in August 2025, physical on-site structural development has officially commenced as of June 2026.

Featured Metallurgical Industries

Fabricated Metal Products Mfg. Expansion Project in Raipur, Chhattisgarh

State: Chhattisgarh
Investment: NA
Updated: 05 June 2026

Executive Summary: A major manufacturing facility in Raikheda, Raipur, Chhattisgarh is expanding its industrial output across a 7.284-hectare site. The project boosts fabricated metal capacities to 60,000 MT/Year, prefab structures to 60,000 MT/Year, and fly ash building blocks to 5,00,00,000 units annually, while introducing a 3,00,000 MT/Year biomass briquette plant. Statutory state pollution control consent was secured as of June 2026.

Featured Manufacturing

HB Wire and Binding Wire Mfg. Project in Raipur, Chhattisgarh

State: Chhattisgarh
Investment: NA
Updated: 05 June 2026

Executive Summary: A multi-product wire and fencing manufacturing plant is slated for development in Siltara, Dharsiwa, Raipur, Chhattisgarh. The setup targets an annual output of 8,000 M.T. of HB and Binding Wire, alongside specialized units for wiremesh, weldmesh, chain link fencing, barbed wire, and nails. The mandatory state pollution control consent to establish was officially secured as of June 2026.

Featured Metallurgical Industries

Rs.150 Million Special Steel ingots Mfg. Expansion Project in Paschim Bardhaman, West Bengal

State: West Bengal
Investment: From 100 Million to 999 Million
Updated: 05 June 2026

Executive Summary: A metallurgical manufacturing facility at the Mangalpur Industrial Complex in Raniganj, Paschim Bardhaman, West Bengal, is expanding its production capacity for specialized steel ingots by 32,600 Metric Tonnes/Year. The industrial expansion represents an estimated capital layout of Rs. 150 million. The facility officially secured its mandatory state pollution control "Consent to Establish" clearance as of June 2026.

Featured Food Processing

Rs.100 Million Grain Based Distillery Expansion Project in Prakasam, Andhra Pradesh

State: Andhra Pradesh
Investment: From 100 Million to 999 Million
Updated: 05 June 2026

Executive Summary: A grain-based distillery unit located in Old Singarayakonda, Prakasam, Andhra Pradesh, is expanding its production capacity from 150 KLPD to 165 KLPD. Moving through multi-year development phases, the final expansion is backed by an incremental capital investment of Rs. 100 million. The facility has successfully secured its official state pollution control clearance to begin technical integration.

Featured Chemicals

Rs.305 Million Bulk Drugs and Drug Intermediates Mfg. Unit in Bharuch, Gujarat

State: Gujarat
Investment: From 100 Million to 999 Million
Updated: 04 June 2026

Executive Summary: A new chemical manufacturing unit focusing on bulk drugs and drug intermediates is planned for Survey No: 111, Amod, Hansot, Bharuch, Gujarat. Financed with an investment of Rs. 305 million, the facility features a production capacity of 362.4 TPA. Construction spans from January to May 2027. Environmental clearance from state authorities is currently pending approval.

Featured Metallurgical Industries

Rs.1223 Million Melting of Non-Toxic Metals Expansion Project in Ahmadabad, Gujarat

State: Gujarat
Investment: From 1000 Million to 4999 Million
Updated: 04 June 2026

Executive Summary: A non-toxic metal melting expansion project is planned for Dekavada, Detroj-Rampura, Ahmedabad, Gujarat, utilizing gas or electrical fuel infrastructure. The development scales annual production capacity to between 60,000 and 1,20,000 tonnes. Backed by a capital investment of Rs. 1,223.3 million, construction will run from July 2026 to June 2027, pending mandatory state environmental clearance.