Latest Project Updates
Rs.35037 Million New 6-lane Capital Region Ring Road in Dhenkanal, Odisha
Executive Summary: A massive new 6-lane Capital Region Ring Road project is planned in Odisha, connecting Gobindpur near Kuspangi (NH-42) to Tangi near the Bandalo Toll Plaza (NH-16). Spanning from chainage Km. 70.540 to Km. 110.870, this infrastructure development requires an investment of Rs. 35,037 million. The proposal is currently pending environmental clearance from state authorities.
Rs.3610 Million New Rail Linked Logistic Park in Pune, Maharashtra
Executive Summary: A new rail-linked logistics park spanning 40,932.7 square meters is planned for development in Aundhe kh, Devale, and Dongargaon, Pune, Maharashtra. Financed with a capital investment of Rs. 3,610 million, the facility integrates specialized rail-siding infrastructure with modern storage hubs. Construction is slated from August 2026 to December 2028, pending mandatory state environmental clearance approvals.
Rs.590 Million Kraft Paper Mfg. Expansion Project in Krishna, Andhra Pradesh
Executive Summary: A kraft paper manufacturing facility in Bapulapadu, Krishna district, Andhra Pradesh, is expanding its production capacity from 200 TPD to 380 TPD. The expansion project involves a fresh capital injection of Rs. 590 million, building on the initial Rs. 376.6 million investment. The state pollution control authorities have granted official consent to establish the expanded setup.
Rs.374 Million New Benzol Processing Unit in Rajnandgaon, Chhattisgarh
Executive Summary: A new 1,20,000 MTPA Benzol Processing Unit is planned for development in Gopalpur and Gidhwa villages, Rajnandgaon, Chhattisgarh. Representing an investment of Rs. 374 million, the project’s environmental clearance application was submitted in May 2026. Onsite construction is scheduled to run from January 2027 through December 2027.
Rs.220560 Million Aluminium Smelter Expansion Project in Singrauli, Madhya Pradesh
Executive Summary: A major metallurgical expansion project is planned across several villages in Bargawan, Singrauli, Madhya Pradesh. The massive Rs. 2,20,560 million development will expand an aluminium smelter from 3.98 LTPA to 7.96 LTPA and boost captive power generation from 900 MW to 1,500 MW. Environmental clearance was sought in May 2026, with construction slate to run from April 2027 through December 2029.
Rs.279300 Million New Glass Core Substrate Mfg. Facility in Odisha
Executive Summary: An advanced $3.3 billion semiconductor packaging glass-core substrate manufacturing facility is coming to the Bhubaneswar–Khurda region, Odisha. Formally initiated via a state government MoU in May 2026, the project will be built in phases over five to six years. It will create over 1,800 high-skilled jobs and establish a localized tech supply chain.
New 4 MW Green Hydrogen Project in Tamil Nadu
Executive Summary: A new 4 MW green hydrogen infrastructure facility is under development in Neyveli, Tamil Nadu, designed to produce up to 700 metric tonnes annually. Utilizing specialized domestic Proton Exchange Membrane (PEM) electrolyzer tech integrated with custom clean-energy EPC infrastructure, the plant will support multi-sector operations, including power generation and mobility. Pre-project execution stages are actively progressing
Rs.910 Million New Domestic Appliances, Personal Care Mfg. Unit in Uttar Pradesh
Executive Summary: A new domestic appliances, electrical products, and personal care manufacturing facility is being established in Uttar Pradesh's YEIDA zone. Backed by an investment of Rs. 910 million, the project reached a major milestone in mid-2026 after receiving its official land allotment from the state government. Basic engineering design layouts and structural clearances are currently being compiled.
Rs.660 Million New Electronic Products Mfg. Unit in Uttar Pradesh
Executive Summary: A new Rs. 660 million manufacturing facility dedicated to heavy electrical infrastructure and clean-tech components is being developed in Uttar Pradesh's YEIDA zone. The plant will produce power transformers, switchgears, and EV charging units. As of June 2026, the project has transitioned into active design planning following official state land allotment clearances.
Rs.2200 Million 2-wheeler Tyre Plant and Off-Highway Tyre Plant Expansion Project in Tamil Nadu
Executive Summary: A prominent tire manufacturer is implementing a Rs. 2,200 million brownfield expansion at its production complex in Madurai, Tamil Nadu. The strategy scales two-wheeler tire output by 5% and off-highway tire capacity by 25% to support growing global demands. Financed via internal accruals and debt, the project phases will roll out between mid-2027 and early 2028.