Latest Project Updates
Rs.300 Million Onshore Oil and Gas Development Expansion Project in Mahesana, Gujarat
Executive Summary: An onshore expansion project in the Karjisan Field, Cambay Basin, Gujarat, involves drilling 21 new development wells and installing 2 early production systems. Financed with a Rs. 300 million investment, the project aims for peak outputs of 500 m³/day crude oil and 100,000 m³/day natural gas. Full environmental clearance was granted by the MoEFCC in June 2026.
Rs.500 Million Clinker and Cement Mfg. Expansion Project in Janjgir - Champa, Chhattisgarh
Executive Summary: An industrial brownfield expansion at an existing 82-hectare cement plant in Janjgir-Champa, Chhattisgarh, will upgrade clinker capacity to 2.1 MTPA and finished cement output to 3.1 MTPA. Backed by a Rs. 500 million capital outlay, the project introduced a product-mix optimization plan to SEIAA for environmental clearance in June 2026, targeting construction from September 2026 to June 2028.
Rs.970 Million Medical Science and Hospital Expansion Project in Dharwad, Karnataka
Executive Summary: A Rs. 970 million medical college and hospital expansion project is underway in Dharwad, Karnataka. The development upgrades hospital capacity from 1,380 to 1,545 beds while expanding the structural built-up footprint to 217,494.1 m². Filed for SEIAA environmental clearance in June 2026, the construction schedule spans from June 2026 to June 2028.
Rs.25420 Million New Electrolyser Manufacturing Gigafactory in Vadodara, Gujarat
Executive Summary: A massive Rs. 25,420 million greenfield Electrolyser Manufacturing Gigafactory is planned over 129,279 m² at GIDC PCC Area, Vadodara, Gujarat. Designed to build core green hydrogen infrastructure, the project was submitted for SEIAA environmental clearance in June 2026. Fast-track construction is scheduled to span from July 2026 to June 2027.
Rs.209 Million New Ferrous and Non- Ferrous Metal Extraction Unit in Gurugram, Haryana
Executive Summary: A new Rs. 209.4 million Ferrous and Non-Ferrous Metal Extraction Unit is planned over 40,493.69 m² in Village Mao, Pataudi, Gurugram, Haryana. The metallurgical facility filed for SEIAA environmental clearance in June 2026. Fast-track plant construction is scheduled to break ground in July 2026, with full operational commissioning targeted for July 2027.
Rs.1740 Million New Hospital Construction Project in Ranga Reddy, Telangana
Executive Summary: A new Rs. 1,740 million, 250-bedded multi-specialty hospital is planned for Saroornagar, Ranga Reddy, Telangana. Built across a 6,717.72 m² plot, the 12-story high-rise facility will feature a total built-up area of 38,031.95 m². Submitted for SEIAA environmental clearance in June 2026, construction is scheduled to run from September 2026 to September 2028.
Rs.4000 Million New Hotel Buildings Construction Project in Visakhapatnam, Andhra Pradesh
Executive Summary: A new Rs. 4,000 million luxury hotel-cum-resort complex is planned for Bhimili Mandal, Visakhapatnam, Andhra Pradesh. The project features a (B+2) floor hotel structure alongside a (G+4) floor shopping and office building. Filed for SEIAA environmental clearance in June 2026, the extensive construction timeline is scheduled from August 2026 to December 2029.
Rs.2000000 Million New Data Center Project in Raigad, Maharashtra
Executive Summary: A monumental 3 GW hyperscale data center complex is planned for development within the Raigad Pen Growth Center in Raigad, Maharashtra. Representing a massive capital layout of Rs. 2,000,000 million, the project reached a major milestone in June 2026 by securing a formal Letter of Intent for land allotment to house the massive digital infrastructure.
Rs.1370 Million New Insulation Tapes Mfg. Project in Sri Sathya Sai, Andhra Pradesh
Executive Summary: A new Rs. 1,370 million manufacturing plant is coming up at the APIIC Industrial Park in Gudipalli, Sri Sathya Sai District, Andhra Pradesh. The facility will manufacture 9,000 TPA of insulation tapes and 9,500 TPA of decorative extruded profiles. As of June 2026, the project has secured formal Consent to Establish from state pollution control authorities.
Rs.19111 Million New 4 Lane Divided Carriageway Development Project in Rewa, Madhya Pradesh
Executive Summary: A Rs. 19,111 million highway expansion project is under implementation in Madhya Pradesh. The project involves widening 54.20 km of NH-39 to a 4-lane divided carriageway across the Rewa-Churhat and Churhat-Sidhi sections.