Latest Project Updates
Rs.343 Million New LPG Cylinder Filling Unit in Balasore, Odisha
Executive Summary: A new LPG cylinder filling and bottling unit is planned for development at Mouza Barapada in the Balasore district of Odisha. Representing a total capital investment of Rs. 343.9 million, the upcoming energy facility will feature a monthly capacity of 7,200 cylinders. As of July 2026, the project has officially secured environmental clearance from state pollution control authorities to proceed.
Rs.280 Million Steel Fabrication Project in Kangra, Himachal Pradesh
Executive Summary: A precision engineering firm is executing a new Rs. 280 million structural steel fabrication plant in Sansarpur Terrace, Kangra, Himachal Pradesh. The greenfield unit is optimized to process a manufacturing capacity of 25,000 Kilograms/Month, focusing on standardized transit and infrastructure assemblies. State pollution control regulators formally granted the critical Consent to Establish as of July 2026.
New Mattress Mfg. Unit in Bhubaneswar, Odisha
Executive Summary: A new manufacturing facility is coming up in Mouza Kujimahal, Bhubaneswar, Odisha, after securing necessary environmental clearances from state pollution control authorities. The upcoming plant is designed to manufacture comfort products, maintaining a steady monthly production capacity of 5,500 mattresses and 5,500 pillows to meet growing market demands.
Rs.153 Million New Sewage Treatment Plant in Rangareddy, Telangana
Executive Summary: A new ₹153 million public utility project is underway to construct a 7 MLD Sewage Treatment Plant across Gowrelly, Kuntloor, and Abdullapurmet in Rangareddy, Telangana. Designed to manage urban wastewater and enhance local sanitation infrastructure, the project advanced into active development stages in July 2026 after receiving the formal Consent to Establish from state pollution control authorities.
Rs.6000 Million New Steel Plant in Bilaspur, Chhattisgarh
Executive Summary: A scaled ₹6,000 million greenfield steel plant is coming up in Ghutku, Bilaspur, Chhattisgarh. The comprehensive complex integrates a 2,31,000 TPA sponge iron unit, a 2,47,500 TPA steel melting shop, a structural rolling mill, a dual-furnace ferro alloy facility, and a 45 MW captive power plant. Construction spans from January 2027 to December 2029, pending state environmental clearance.
Rs.8450 Million Steel Plant Expansion Project in Raigarh, Chhasttisgarh
Executive Summary: A company is planning to expand its existing steel plant in Chhattisgarh by adding iron ore beneficreening, pellet, sponge iron, induction furnace, CM-Double strand, strip rolling mill, ERW pipe manufacturing, and a 42 MW captive power plant. The estimated cost is Rs.6410 million and environment clearance is underway.
Rs.1975 Million New Factory Building Construction Project in Gautam Buddha Nagar, Uttar Pradesh
Executive Summary: A massive home appliance manufacturing factory spanning 102,007.20 square meters is slated for development at Sector-28, YEIDA, in Gautam Buddha Nagar, Uttar Pradesh. Estimated at Rs. 1,975.8 million, the infrastructure project is scheduled to begin construction in September 2026 and finish by October 2030. The proposal is currently under environmental clearance review.
Rs.425 Million Adhesives Mfg. Unit Expansion Project in Satara, Maharashtra
Executive Summary: An industrial adhesives manufacturing facility in Satara, Maharashtra, is executing a Rs. 425 million expansion project. The site will add massive capacities for Flex Pack, Pressure Sensitive Hygiene, Hot Melt, and Water-based adhesives alongside engineering variants. Backed by central environmental clearance, construction activities are scheduled to begin in October 2026, with full operations targeted for September 2029.
Rs.37702 Million New Oil and Gas Production Project in Gujarat
Executive Summary: A major energy corporation is investing Rs 37,702.4 million to develop 656 onshore oil and gas wells across 52 blocks in Gujarat’s Kheda, Gandhinagar, Mehsana, and Ahmedabad districts. Aiming for a 3,810,000 MT capacity, the project is scheduled for execution between June 2026 and March 2029. Environmental clearance is currently being sought from state authorities.
New Cold Storage Unit in Guntur, Andhra Pradesh
Executive Summary: A new Rs. 70.3 million cold storage unit is coming up at Sy.No. 601, Bypass Road, Ankireddypalem, Guntur. The facility features a capacity of 65,000 bags per annum, specializing in preserving agricultural products like red chilies. As of June 2026, state pollution control authorities have granted the crucial Consent to Establish.