Rs.6795 Million New Berth No 9 and 10 Development & Mechanization Project in Purba Medinipur, West Bengal
Executive Summary: A massive ₹6,795.8 million maritime infrastructure project is underway to develop and mechanize Berth No. 9 and 10 at the Haldia Dock Complex in Purba Medinipur, West Bengal. Executed via the Public-Private Partnership route to optimize bulk cargo logistics, the formal development tender was published in July 2026. Construction is scheduled to span from September 2027 to September 2030.
New Polypropylene Woven Bags Mfg. Project in Rajnandgaon, Chhattisgarh
Executive Summary: A new polypropylene woven bags manufacturing plant is under development at Plot No. A-1 in the Mamta Nagar Industrial Area, Rajnandgaon, Chhattisgarh. Deployed to produce 1,00,000 packaging units per annum for commercial goods, the strategic manufacturing venture cleared its regulatory phase in July 2026 after receiving the formal Consent to Establish from state pollution control authorities.
Rs.240 Million New Four lane Road Construction Project in Bhopal, Madhya Pradesh
Executive Summary: A new 35.611 km four-lane bypass project featuring paved shoulders is slated for development along the South-Western Ring Road corridor in Bhopal, Madhya Pradesh. Connecting major state and national highways to relieve metropolitan traffic congestion, the Rs. 240.6 million civil infrastructure development will undergo construction from January 2027 to December 2029, pending state-level environmental clearance approvals.
Rs.3088 Million Grain Based Distillery Plant Expansion Project in Raipur, Chhattisgarh
Executive Summary: A ₹3,088 million grain-based distillery expansion project is underway in Dondekala, Raipur, Chhattisgarh, scaling capacity from 100 KLD to 300 KLD. It will produce bio-ethanol, ENA, or chemical derivatives (100 TPD), backed by an expanded 12 MW co-generation plant. Currently awaiting environmental clearance as of July 2026, construction is scheduled to span from December 2026 to February 2027.
Rs.6000 Million New Steel Plant in Bilaspur, Chhattisgarh
Executive Summary: A scaled ₹6,000 million greenfield steel plant is coming up in Ghutku, Bilaspur, Chhattisgarh. The comprehensive complex integrates a 2,31,000 TPA sponge iron unit, a 2,47,500 TPA steel melting shop, a structural rolling mill, a dual-furnace ferro alloy facility, and a 45 MW captive power plant. Construction spans from January 2027 to December 2029, pending state environmental clearance.
Rs.8450 Million Steel Plant Expansion Project in Raigarh, Chhasttisgarh
Executive Summary: A company is planning to expand its existing steel plant in Chhattisgarh by adding iron ore beneficreening, pellet, sponge iron, induction furnace, CM-Double strand, strip rolling mill, ERW pipe manufacturing, and a 42 MW captive power plant. The estimated cost is Rs.6410 million and environment clearance is underway.
Rs.160 Million Industrial Machines and Industrial Tools Mfg. Unit in Bangalore, Karnataka
Executive Summary: A new Rs. 160 million industrial machinery manufacturing unit is under development at the Adinarayana Hosahalli 2nd Phase Industrial Area in Bangalore, Karnataka. The production plant will manufacture specialized workshop equipment including panel saws, edge banders, lathes, and air compressors. Approved by state clearance committees, primary physical structural construction officially commenced on-site in June 2026.
Rs.8950 Million New Integrated Defence Explosives Mfg. Unit in NTR, Andhra Pradesh
Executive Summary: A new integrated defense explosives manufacturing facility is slated for development on a 300-acre site in Jayanthipuram, Jaggayyapeta, NTR district, Andhra Pradesh. The Rs. 8,950 million complex will house indigenous subassembly lines, advanced R&D labs, and critical raw material production. The strategic project advanced significantly following a formal land allotment order issued in June 2026.
Rs.288 Million New Warehouse Project in Jalandhar, Punjab
Executive Summary: A new supply chain logistics infrastructure project featuring a 30,022.94 square meter storage warehouse is planned for development in Mehmudpur, Adampur, Jalandhar, Punjab. Budgeted at Rs. 288 million, the construction timeline runs from July 2026 through May 2027. The large-scale distribution hub is currently undergoing formal review for state-level environmental clearance.
Rs.1238 Million New Warehousing Unit in Unnao, Uttar Pradesh
Executive Summary: A new logistics and warehousing facility with a storage capacity of 49,663.765 square meters is planned for Village Mehnora, Hasanganj, Unnao, Uttar Pradesh. Estimated at Rs. 1,238.2 million, the supply chain asset is scheduled for a construction timeline running from December 2026 to November 2028. The proposal is currently under state-level environmental review.