Latest Project Updates
Rs.312 Million Industrial Shed Expansion Project in Virudhunagar, Tamil Nadu
Executive Summary: A ₹31.28 crore infrastructure expansion is launching in Sivakasi, Tamil Nadu, featuring a 34,523 sq. m. industrial shed. The facility will support advanced manufacturing of aluminum-based powders and pigments. Currently awaiting environmental clearance as of April 2026, the project utilizes pre-engineered building technology for a rapid three-month construction phase scheduled to conclude by July 2026.
Rs.5095 Million New Carbonated Soft Drinks/ Juice Based Drinks Mfg. Plant in Rajasthan
Executive Summary: A ₹509.52 crore greenfield bottling plant is being developed in Suratgarh, Rajasthan, to produce carbonated drinks and packaged water. The facility features a 51,080 sq. m. built-up area and an integrated 5 MW solar plant. Currently seeking environmental clearance as of April 2026, construction is scheduled from July 2026 to February 2027 to serve the Northern Indian market.
Rs.1250 Million New 5-Star Hotel in Guntur, Andhra Pradesh
Executive Summary: A ₹125 crore 5-star hotel and convention center is coming to Amaravati, Guntur, featuring 192 guest rooms across 11 floors. Spanning a 54,459 sq. m. built-up area, the facility will include premium banquet halls and luxury amenities. Currently seeking environmental clearance as of April 2026, the project is scheduled for construction from May 2026 to March 2029.
Rs.800 Million New Oil and Gas Exploration Project in Bharuch, Gujarat
Executive Summary: A ₹80 crore hydrocarbon exploration project is planned for the Western Onshore Basin in Bharuch, Gujarat. The initiative involves drilling and appraising two wells in the Pakhajan Ext-II area to evaluate oil and gas potential. Currently awaiting environmental clearance as of April 2026, the drilling operations are scheduled for a three-month window starting in August 2026.
Rs.20000 Million New Electricity Transmission Project in Raigad, Maharashtra
Executive Summary: A ₹1,660 crore inter-state transmission project is underway in Maharashtra to evacuate 1.5 GW of green energy from pumped storage facilities. The initiative involves establishing 3,000 MVA substation capacity and 765kV infrastructure to serve Mumbai and surrounding regions. Construction commenced in May 2025, with a scheduled commissioning deadline of January 2028 to enhance regional grid stability.
Rs.25264 Million New Railway Line in Kutch, Gujarat
Executive Summary: A ₹2,526.47 crore infrastructure project is under development in Kutch, Gujarat, to construct a 145 km new railway line. Connecting Deshalpar to Lakhpat, the broad-gauge link will feature 13 stations to facilitate mineral transport and border area mobility. Backed by the PM Gati Shakti plan, the project is currently in the active implementation phase, targeting completion by March 2029.
Rs.130376 Million New Metro Rail Project in Jaipur, Rajasthan
Executive Summary: A new metro rail corridor spanning 41 km is planned to enhance urban mobility across Jaipur with 36 stations including underground sections near the airport. The project, costing Rs 130376.6 million, will be executed through a joint venture model with central and state government participation. It will integrate with the existing metro network, improve connectivity to key industrial and residential areas, and is targeted for completion by September 2031 following multi-level approvals.
Rs.800 Million New Pharmaceutical Formulations Unit in Eluru, Andhra Pradesh
Executive Summary: A ₹80 crore pharmaceutical formulations unit is being established in Eluru, Andhra Pradesh, specializing in high-volume injectable production. The facility will manufacture critical care vials and ampoules, including Tranexamic Acid and Acetaminophen infusions. As of April 2026, the project has secured state pollution board consent, moving into the active construction and machinery procurement phase.
Rs.141058 Million New Kalai II Hydro Electric Project in Anjaw, Arunachal Pradesh
Executive Summary: A 1200 MW hydroelectric project in Kamdi Village, Arunachal Pradesh, is planned, with construction set to run from July 2025 to January 2032, costing approximately Rs.128015.4 million. The project awaits environmental clearance, currently under examination by the Ministry of Environment, Forest, and Climate Change as of March 2024.
Rs.100 Million Manganese Oxide Expansion Project in Nagpur, Maharashtra
Executive Summary: A ₹10 crore expansion project in Nagpur, Maharashtra, is set to scale the production of Manganese Oxide and Ferro Alloys to 0.024 MTPA. Utilizing Induction Furnace and Thermite processes, the initiative is currently awaiting environmental clearance as of April 2026. Construction is scheduled for a six-month window starting in April 2027 to meet rising metallurgical and battery industry demands.