Latest Project Updates
Rs.100 Million Battery Mfg. Unit Expansion Project in Vizianagaram, Andhra Pradesh
Executive Summary: An energy storage systems manufacturer is executing a Rs. 100 million plant expansion in Vizianagaram, Andhra Pradesh. The project introduces specialized high-volume assembly lines for Nickel-Cadmium batteries, establishing a production capacity of 40 million Ampere Hours monthly. As of June 2026, the unit has secured state pollution control consent to establish.
Rs 350 Million New HDPE/PP Recycling Facility in Jalgaon, Maharashtra
Executive Summary: A new HDPE and PP recycling facility is being planned at Additional Jalgaon MIDC in Maharashtra with an investment of over Rs 350 million. The project will feature advanced extrusion and granulation technology along with deep-vacuum deodorisation systems for producing industrial-grade recycled plastic granules. The plant will initially process 1,100 tonnes per month and forms part of a larger Rs 5,000 million recycling and circular manufacturing programme in the state. Commissioning is targeted between October and December 2026 with support from the Government of Maharashtra for land allotment and approvals.
Rs.600 Million New EV Vehicles Batteries, Inverters Mfg. Unit in Khordha, Odisha
Executive Summary: A new greenfield energy storage plant is planned for Khordha, Odisha, featuring a Rs. 600 million investment. The advanced manufacturing hub will produce lithium-ion electric vehicle (EV) battery packs and smart inverter assemblies using high-performance LFP/NMC chemistries. The project has formally received investment approval from the State-Level Single Window Clearance Authority to proceed with immediate site development.
New Hume Pipes, PCC Poles Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new civil infrastructure components plant is coming up in Raipur, Chhattisgarh, setup to manufacture 20,000 Hume pipes and 70,000 PCC poles annually, supported by an 18,000 TPA mild steel binding wire drawing line. The facility has formally received its statutory Consent to Establish from state pollution control regulators to begin structural site construction.
Rs.216 Million Aluminium Alloy Rod Mfg. Expansion Project in Howrah, West Bengal
Executive Summary: A metallurgical and cable production plant expansion is under development at the Jalan Industrial Complex in Howrah, West Bengal. Budgeted at Rs. 216.44 million, the project introduces capacities for alloy rods, coated wires, and millions of meters of ACSR/AAAC conductors monthly. The facility has formally secured its statutory Consent to Establish from state pollution control regulators.
Rs.180000 Million New Solar Modules Mfg. Facility in SPSR Nellore, Andhra Pradesh
Executive Summary: A 10 GW mega-scale integrated solar PV manufacturing facility spanning over 3.4 million square meters is being built in SPSR Nellore, Andhra Pradesh. Backed by an investment of Rs. 180,000 million, the site will produce ingots, wafers, cells, and modules. Construction runs from March 2026 through March 2031, with state environmental clearance currently under review.
Rs.338 Million Industrial Safety Shows Mfg. Expansion Project in South 24 Parganas, West Bengal
Executive Summary: A major personal protective equipment expansion project is underway in Bhangar, South 24 Parganas, West Bengal. The facility aims to drastically scale up domestic capacities, producing 200,000 industrial safety shoes and 400,000 face masks monthly. Backed by an investment of Rs. 338.742 million, the project has secured formal Consent to Establish from state pollution control boards as of June 2026.
Rs.1000 Million New Insulator Harware, Sub Station Connector Mfg. Unit in Bangalore, Karnataka
Executive Summary: A state-of-the-art electrical equipment manufacturing plant is being established in the Adinarayanahosahalli Phase-II Industrial Area, Bangalore, Karnataka. The project scales up localized production lines for insulator hardware, substation connectors, conductors, and earthwire accessories with an investment of Rs. 1,000 million. Following state single-window approval in August 2025, physical on-site construction work has officially commenced as of June 2026.
Rs.180 Million New Composite Polymers Mfg. Unit in Bangalore, Karnataka
Executive Summary: A new heavy electrical manufacturing plant is being established in the Adinarayanahosahalli Phase-II Industrial Area, Bangalore, Karnataka. The project scales up localized production lines for composite polymer equipment and surge arresters with an investment of Rs. 180 million. Following state single-window approval in August 2025, physical on-site construction work has officially commenced as of June 2026.
Rs.1035 Million New IOT Sensor and Devices Mfg. Unit in Bangalore, Karnataka
Executive Summary: A modern high-tech manufacturing plant is being established in the Adinarayanahosahalli Phase-II Industrial Area, Bangalore, Karnataka, to produce specialized IoT sensors and smart devices. Financed with an investment of Rs. 1,035 million, the proposal cleared the SLSWCC administrative board in August 2025. Moving directly into execution, on-site construction and development work has officially commenced as of June 2026.