Latest Project Updates
Expansion of Construction Materials Mfg. Project in Raipur, Chhattisgarh
Executive Summary: An expansion of a construction manufacturing project in Bendri, Dharsiwa, Raipur, Chhattisgarh, spans 3.578 hectares with increased production capacities: Re-Rolled Products (59,900 MT/year), MS Pipes (1,00,000 MT/year), GI Pipes (1,00,000 MT/year), Fabrication Metal Products (50,000 MT/year), and Scaffolding Equipment (50,000 MT/year). The project received Consent for Establishment from the Chhattisgarh Environment Conservation Board in December 2024.
Rs.575 Million Steel Pipes Mfg. Project in Tirupati, Andhra Pradesh
Executive Summary: A new steel pipes manufacturing project is planned in the Industrial Park, Chinnapanduru Village, Varadaiahpalem, Tirupati, Andhra Pradesh, with a production capacity of 330 TPD. The project, estimated to cost Rs. 575 million, will meet rising industrial demand. As of December 2024, it has received consent from the state pollution control authorities for establishment.
Rs.123 Million New Steel and Steel Product Mfg. Project in Ludhiana, Punjab
Executive Summary: A new manufacturing project in Industrial Area-C, Dhandhari Kalan, Ludhiana, Punjab, will produce iron and stainless steel castings (2.0 MT/day), brass castings (0.300 MT/day), and aluminum castings (0.300 MT/day). With an investment of Rs. 123.542 million, the project received Consent for Establishment from the Punjab Pollution Control Board by December 2024, ensuring compliance with environmental regulations.
New Metallurgical Products Mfg. Project in Patna, Bihar
Executive Summary: A new metallurgical products manufacturing project is planned in Devkuli, Bihta, Patna, Bihar, focusing on producing finished billets and rolled products. With an estimated investment of ₹385.459 million, the project aims to enhance steel production capacity. The investment proposal was submitted to the State Investment Promotion Board in September 2024, and approval was granted in December 2024.
Rs.3500 Million Grinding of Coal Expansion Project in Chandrapur, Maharashtra
Executive Summary: A coal grinding and steel manufacturing expansion project is planned in Chandrapur, Maharashtra, involving DRI kilns, induction furnaces, a rolling mill, and a 30 MW power plant. The Rs. 3500 million project’s construction is set for June 2025 to April 2026, pending environmental clearance.
Rs.158 Million Sponge Iron Expansion Plant in Giridih, Jharkhand
Executive Summary: A company plans to expand its sponge iron plant in Mahuatand, Giridih, Jharkhand, increasing production from 33,000 TPA to 62,700 TPA and adding a captive power plant, M.S. billets production, re-rolling mill, and slag crusher unit. The project, costing Rs.158.4 million, is scheduled from August to November 2024, pending environmental clearance.
Slica Sand Washing Plant in Bharuch, Gujarat
Executive Summary: A firm plans to set up a silica sand washing plant in Bharuch, Gujarat, with a capacity of 18,000 MTPA. The Rs. 60 million project is scheduled for construction from March to May 2025 and is under environmental review as of December 2024.
Rs.760 Million Greenfield Steel Plant in Sirkakulam, Andhra Pradesh
Executive Summary: A metals and alloys firm plans to set up a Greenfield steel plant in Srikakulam, Andhra Pradesh, with 3 x 9 MVA SEAF units and a 100 TPD sinter plant. The Rs. 760 million project, producing silico/ferro manganese and ferro silicon, is under environmental review.
Rs.3608 Million New Steel Tubes & Pipes Expansion Plant in Kachchh, Gujarat
Executive Summary: A major steel manufacturing expansion project in Gujarat aims to boost production capacity from 12,000 MTPM to 93,500 MTPM, with an investment of ₹3601.1 million. Set for completion by May 2024, the project includes increased output of steel tubes, pipes, and fabricated structures, along with a new coil pickling unit, enhancing capabilities and diversifying product lines.
Rs.675 Million Grey & SG Iron Castings Expansion Project in Erode, Tamil Nadu
Executive Summary: A grey and SG iron castings expansion project in Tamil Nadu aims to increase production capacity from 72,000 TPA to 1,16,000 TPA with a ₹675 million investment. Advanced equipment, including induction furnaces and sand-handling systems, will be installed. Construction starts in August 2025 and ends by March 2027, with environmental clearance under review as of December 2024.