Latest Project Updates
Rs.1979 Million New Liquid Vials Mfg. Unit in Siddipet, Telangana
Executive Summary: A company plans a new liquid vials manufacturing unit in Siddipet, Telangana, producing 12.5 million liquid vials and lyophilized vials each, 3.125 million prefilled syringes, and 3.125 million cartridges annually. The project, estimated at ₹1,979.8 million, has obtained consent from the state pollution control authorities as of September 2025, allowing the company to proceed with establishment.
Rs.3857 Million Grain Based Distillery Mfg. Expansion Project in Wanaparthy, Telangana
Executive Summary: A grain-based distillery in Rangapur, Pebbair, Wanaparthy, Telangana, is planning to expand production of Rectified Spirit/ENA/Ethanol from 150 KLD to 180 KLD and upgrade its power plant. The project, located on 30 acres, includes adding Malt Spirit (12 KLPD). Total investments are Rs. 3,026–3,857.4 million, with environmental consent received.
Rs.2200 Million New Special Food Processing Park in Kamareddy, Telangana
Executive Summary: A new Special Food Processing Park is planned at Lingampally, Jangoan, and Karadpally villages in Sadashivanagar, Kamareddy district. The project includes developing 124 plots with supporting infrastructure, at an estimated cost of Rs. 2,200 million. As of September 2025, it has received consent from state pollution control authorities for establishment.
Rs.740 Million Pharma Unit Expansion Project in Medchal-Malkajgiri, Telangana
Executive Summary: A pharmaceutical unit expansion is planned at Phase-III, IDA, Jeedimetla, Quthubullapur, Medchal-Malkajgiri, Telangana. The project will boost production of Guaifenesin, Methocarbamol, Metformin HCl, and formulation ingredients with a total capacity addition of over 725 TPM. Estimated at Rs. 740.1 million, it has received consent from state pollution control authorities as of September 2025.
New Commercial Building Construction Project in Ranga Reddy, Telangana
Executive Summary: A company plans a new commercial building in Madhapur, Ranga Reddy, Telangana, with a total built-up area of 2,03,764.88 sq. meters. The project, estimated at ₹48.3 million, is scheduled to start in October 2025 and complete by December 2029. As of September 2025, the project has been submitted to the State Level Environment Impact Assessment Authority for environmental clearance.
Rs.900 Million New Canning Line Unit in Telangana
Executive Summary: A beverage company is setting up a new canning line at its brewery in Hyderabad, Telangana. The project will add 0.4 million hectolitres to the existing 0.5 million hectolitres, raising total capacity to 0.9 million hectolitres. Estimated at ₹900 million, the facility is expected to be operational within a year. As of September 2025, pre-project activities are underway.
Rs.3900 Million Commercial Building Construction Project in Ranga Reddy, Telangana
Executive Summary: A commercial building project is planned at Nanakramguda, Ranga Reddy, Telangana, featuring retail and office space named “Two West,” comprising 3 basements, ground, 1st floor, 4 stilts, 23 upper floors, and a terrace with an environment deck. With a built-up area of 1,43,595.25 sq.m. and cost of Rs.3,900 million, construction is scheduled from October 2025 to November 2028, pending state environmental clearance.
Rs.445 Million Bulk Drugs Mfg. Expansion Project in Medchal, Telangana
Executive Summary: A bulk drugs manufacturing facility in Jeedimetla, Telangana, is undergoing expansion to increase output of products like Acetazolamide, Ecabet sodium, and Norfloxacin. With an investment of Rs.445.9 million, the project enhances overall capacity to 638.33 kg/day, including bulk drugs, intermediates, and specialty chemicals. As of August 2025, it has obtained state pollution control consent for establishment.
Rs.230 Million Lamination Unit Expansion Unit in Rangareddy, Telangana
Executive Summary: A lamination unit in Elikatta, Farooqnagar, Telangana, is set for expansion, adding new products—High Pressure Decorative Laminates and Compact Laminates (5,000 units/day)—while continuing existing production of Paper Based Laminated Sheets (10,000 units/day) and Electrical Insulation Sheets (1,500 units/day). The project, costing Rs.230 million, has received state pollution control approval as of August 2025.
Rs.100 Million Melting of Nontoxic Metals Expansion Project in Ranga Reddy, Telangana
Executive Summary: A nontoxic metals melting expansion project is planned in Tigapur, Kothur, Ranga Reddy, Telangana, with a capacity of 0.06–0.12 MTPA using gas or electricity. Estimated at Rs.100 million, construction is scheduled from December 2025 to July 2026. As of August 2025, the project has been submitted to the State Level Environment Impact Assessment Authority for environmental clearance.